Sample of Current Projects
 |
CITY OF GRAND BLANC |
- 2008 LOCAL STREET PROJECT (Greenview, Riverbend to Belsey, Wilkshire Court, Part of Pagels Drive, and Hillcrest Drive) - Surveying, engineering, and construction administration.
- BELLA VISTA DRIVE (Reconstruction from South Saginaw to Via Catherina) - MDOT Programming, surveying, engineering, and construction administration.
- CMAQ - PHASE II - Remove and replace Davis Street and Grand Blanc Road signalization and upgrade three (3) additional intersections to be interconnected to City Hall Traffic Operations Computer, programming, engineering, construction administration, and observation.
- GRAND BLANC ROAD STREETSCAPE (from South Saginaw to Seward Street) - Remove existing roadway and design new roadway, surveying, engineering, utility relocations, and construction administration.
- GRAND BOULEVARD CONSTRUCTION PLANS (from Grand Blanc Road to north of Reid Road) - New road design, surveying, engineering, utility relocations, and construction administration.
- ITS PROJECT (CMAQ GRANT) - PHASE I - Upgrade five (5) signalized intersections and install traffic operations computer, and interconnect all four (4) intersections to new computer. MDOT programming, engineering, construction administration, and observation.
- S2 PROJECT - Sanitary sewer flow metering.
- WHITE BRANCH OF THE BUSH PERRY DRAIN - Storm sewer design project.
 |
LAND DEVELOPMENT |
- ACORN WAY SINGLE FAMILY DEVELOPMENT (Parcelization Plan)
- ARDEN GLEN (Site Condo)
- COOK ROAD OFFICE COMPLEX (Site Condo)
- HEATHERWOOD APARTMENTS - PHASE II
- HIDDEN OAKS NO. 4 (Subdivision Plat)
- HIDDEN OAKS NO. 5 (Subdivision Plat)
- HIDDEN OAKS NO. 6 AND NO. 7 (Previously named TRAILS AT ROCKWOOD) (Subdivision Plat)
- LAKESIDE ACRES - HOUSE PLOT PLANS AND STAKINGS
- MEADOW WALK - PHASE II (GRAND BLANC TOWNSHIP) (Site Condo)
- MEADOW WALK - PHASE III (GRAND BLANC TOWNSHIP) (Site Condo
- ORCHARD PARK - HOUSE PLOT PLANS AND STAKINGS
- OSBURN LAKES - PHASE II (Site Condo)
- GEMSTONE VALLEY - HOUSE PLOT PLANS AND STAKINGS
- STOCKBRIDGE COMMONS NO. 8 (Subdivision Plat)
- STONE CREEK CROSSING (CONCEPT SITE PLAN) (Site & Structure Condo)
- WOODRIDGE FARMS NO. 5 (Subdivision Plat)
 |
GENESEE COUNTY DRAIN COMMISSIONER |
- CONTRACT 3A - REROUTE SANITARY SEWER
- NORTHEAST EXTENSION SANITARY SEWER
- NORTHEAST EXTENSION SANITARY SEWER - CONTRACT #5
- CONTRACT #4 - SANITARY SEWER EASEMENT STAKING
- CONTRACT #5 - SANITARY SEWER REROUTE
- DALY DRAIN #0420 - ENCLOSED AND OPEN DRAIN IMPROVEMENT
- EAST BRANCH OF PHILLIPS DRAIN #0319 - OPEN DRAIN IMPROVEMENT
- McCANDLISH ROAD BRANCH OF THE BUSH DRAIN - OPEN DRAIN IMPROVEMENT
- SLACK LAKE, SAGINAW ROAD EXTENSION #1680 - ENCLOSED STORM SEWER
 |
GENESEE COUNTY PURCHASING DEPARTMENT |
- 2007 - 2008 SURVEY SECTION CORNER REMONUMENTATION
 |
GENESEE COUNTY ROAD COMMISSION |
- BEECHER ROAD (MILL TO LINDEN) - Rehabilitate existing concrete and composite pavement road, engineering, surveying, construction administration, and observation.
- BEECHER ROAD (I-75 TO MILL) - Rehabilitate existing concrete and composite pavement road, engineering, surveying, construction administration, and observation.
- CLIO ROAD (STANLEY RD TO MT. MORRIS RD) - Rehabilitate existing concrete and composite pavement road, engineering, surveying, construction administration, and observation.
- CLIO ROAD (MT. MORRIS RD TO FRANCES RD) - Rehabilitate existing concrete and composite pavement road, engineering, surveying, construction administration, and observation.
- ISLAND VIEW DRIVE - Road reconstruction, surveying, and engineering, rehabilitate existing concrete curb and gutter and totally remove and replace existing HMA (asphalt) pavement.
 |
PARKS AND RECREATIONAL |
- PLACID WATERS RECREATIONAL WATER SKI AND RESIDENTIAL COMMUNITY
- FORESTER WATER SKI LAKE COMMUNITY
- POMPEII WATER SPORTS LAKE
- VICTORY LAKES WATER SKI AND RESIDENTIAL COMMUNITY
- BLACK MOUNTAIN SNOWMOBILE TRAIL FOR MDNR/MDEQ
- CITY OF GRAND BLANC BICYCLE TRANSPORTATION MASTER PLAN
 |
EDUCATIONAL FACILITIES |
- SITE PLAN FOR NEW TRANSPORTATION BUILDING FOR GRAND BLANC COMMUNITY SCHOOLS
- SITE PLAN FOR GYMNASIUM ADDITION FOR GRAND BLANC HIGH SCHOOL
- PARKING LOT ADDITION FOR McGRATH ELEMENTARY, BRENDLE ELEMENTARY, AND MYERS ELEMENTARY FOR GRAND BLANC COMMUNITY SCHOOLS
- ACCESS DRIVE AND PARKING LOT IMPROVEMENTS FOR BENDLE PUBLIC SCHOOLS ADMINISTRATION BUILDING
- WATERMAIN PLANS AND STORM WATER MANAGEMENT PLAN FOR NEW BENDLE HIGH SCHOOL
- WATERMAIN PLANS FOR WATERMAIN EXTENSION TO MORRISH ELEMENTARY, SWARTZ CREEK COMMUNITY SCHOOLS
The above listing is not, of course, inclusive of all communities within which we work nor inclusive of all projects or developers, as it is an ever expanding and living listing. The purpose is to indicate our diversity as it relates to project type.
|
|